Kevin Tait takes a break while excavating trench for "Inspection Pit" drain
- 15-05-10
|
Mike Corcoran, Daniel Sargent & Roger Norris installing drain pipe work - 15-05-10 |
Shed roof- sheet installation all but complete -19-05-10 |
"Inspection Pit" excavation completed - 19-05-10 |
Two Roller Shutter Door mullions in position - 26-05-10 |
Work on the Loco has not been neglected, Boiler front tube plate rivet removal - 06-06-10 |
John Oldcorn grinds tube plate rivet heads in preparation for removal- 06-06-10 |
"Inspection Pit" base ready for pouring of concrete. - 06-06-10 |