May 2010 Progress Page

DSC03076 (102K)Kevin Tait takes a break while excavating trench for "Inspection Pit" drain - 15-05-10
DSC03080 (107K)Mike Corcoran, Daniel Sargent & Roger Norris installing drain pipe work - 15-05-10
DSC03093 (79K)Shed roof- sheet installation all but complete -19-05-10
DSC03100 (94K)"Inspection Pit" excavation completed - 19-05-10
DSC03101 (88K)Two Roller Shutter Door mullions in position - 26-05-10
DSC03371 (110K)Work on the Loco has not been neglected, Boiler front tube plate rivet removal - 06-06-10
DSC03375 (100K)John Oldcorn grinds tube plate rivet heads in preparation for removal- 06-06-10
DSC03378 (106K)"Inspection Pit" base ready for pouring of concrete. - 06-06-10